{"id":2873,"date":"2020-10-29T00:00:00","date_gmt":"2020-10-29T00:00:00","guid":{"rendered":"https:\/\/gwpo-gwp.org\/central-africa\/news\/la-republique-du-cameroun-evalue-le-degre-de-mise-en-oeuvre-de-la-gire\/"},"modified":"2026-05-08T16:08:39","modified_gmt":"2026-05-08T15:08:39","slug":"la-republique-du-cameroun-evalue-le-degre-de-mise-en-oeuvre-de-la-gire","status":"publish","type":"post","link":"https:\/\/gwpo-gwp.org\/central-africa\/news\/la-republique-du-cameroun-evalue-le-degre-de-mise-en-oeuvre-de-la-gire\/","title":{"rendered":"La R\u00e9publique du Cameroun \u00e9value le degr\u00e9 de mise en \u0153uvre de la GIRE"},"content":{"rendered":"\n<p dir=\"ltr\"><span>L&#8217;atelier qui s&#8217;est d\u00e9roul\u00e9 dans les locaux du secr\u00e9tariat du Partenariat R\u00e9gional pour l&#8217;Eau en Afrique Centrale (GWP-CAf) \u00e0 Yaound\u00e9 a \u00e9t\u00e9 organis\u00e9 dans le cadre du deuxi\u00e8me cycle de rapports sur l\u2019ODD 6 soutenu par le Partenariat Mondial pour l&#8217;Eau (GWP) en collaboration avec le<strong> PNUE-DHI<\/strong> et le <strong>PNUD-CAPNET<\/strong> par le biais du&nbsp; <\/span><a href=\"https:\/\/www.gwp.org\/en\/old_sdg6support\/\"><span>\u201cSDG 6 IWRM Support Programme\u201d<\/span><\/a><span>. L&#8217;atelier a rassembl\u00e9 vingt parties prenantes des minist\u00e8res (eau et \u00e9nergie, transport, agriculture, \u00e9conomie et planification, logement et d\u00e9veloppement urbain), des repr\u00e9sentants des agences des Nations unies (<strong>UNESCO<\/strong>), des organisations de la soci\u00e9t\u00e9 civile (<strong>SAILID<\/strong>,<strong> Water for Life<\/strong>,<strong> Young Volunteers for the Environment<\/strong>), du r\u00e9seau des organisations de jeunesse (<strong>RECOJAC<\/strong>), entre autres.<\/span><\/p>\n<p dir=\"ltr\"><span><img loading=\"lazy\" decoding=\"async\" alt=\"\" src=\"https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/whatsapp-image-2020-07-23-at-17.55.01-1.jpeg\" height=\"718\" width=\"1080\"><\/span><\/p>\n<p dir=\"ltr\"><span>Dans son discours d&#8217;ouverture, le Directeur de la Gestion des Ressources en Eau, <\/span><span><strong>M. Mamadou Ousman<\/strong>,<\/span><span> a f\u00e9licit\u00e9 le groupe de travail de l\u2019ODD 6.5.1 d&#8217;avoir pr\u00e9par\u00e9 le projet de rapport pour cette phase du processus. Il a \u00e9galement soulign\u00e9 l&#8217;importance du suivi de l\u2019ODD 6.5.1 &#8220;<\/span><span>en tant qu&#8217;\u00e9l\u00e9ment majeur pour assurer la mise en \u0153uvre correcte et opportune de la GIRE dans le pays&#8221;<\/span><span>.<strong> M. Mamadou Ousman<\/strong> a exprim\u00e9 sa gratitude au <strong>GWP-CAf<\/strong> pour l&#8217;appui <\/span><a href=\"https:\/\/www.gwp.org\/fr\/GWP-Afrique-Centrale\/GWP-CAf-EN-ACTION2\/activites\/le-gwp-caf-coorganise-un-atelier-regional-sur-la-mise-en-uvre-de-lodd6-en-afrique-centrale\/\"><span>technique <\/span><\/a><span>et <\/span><a href=\"https:\/\/www.gwp.org\/fr\/GWP-Afrique-Centrale\/GWP-CAf-EN-ACTION2\/activites\/le-gwp-caf-apporte-son-soutien-a-six-pays-dans-le-processus-de-suivi-de-odd\/\"><span>financier <\/span><\/a><span>apport\u00e9 au Cameroun depuis le <\/span><a href=\"https:\/\/www.gwp.org\/fr\/GWP-Afrique-Centrale\/GWP-CAf-EN-ACTION2\/activites\/minee-evaluates-the-state-of-implementation-of-the-indicator-6.5.1.-of-sdos\/\"><span>premier cycle de rapports en 2017<\/span><\/a><span>, ainsi que pour la facilitation globale de la mise en \u0153uvre de la GIRE depuis 2005. Il a conclu par un appel aux participants \u00e0 contribuer activement et librement aux discussions sur le rapport national, en les assurant que le rapport final soumis refl\u00e9tera les d\u00e9cisions et les recommandations de l&#8217;atelier.<\/span><\/p>\n<p dir=\"ltr\"><span><img loading=\"lazy\" decoding=\"async\" alt=\"\" src=\"https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0002-scaled-1.jpg\" height=\"3648\" width=\"5472\"><\/span><\/p>\n<p dir=\"ltr\">Apr\u00e8s les pr\u00e9sentations sur l\u2019ODD 6.5.1, les participants ont \u00e9t\u00e9 r\u00e9partis en groupes selon les trois sections du questionnaire :<strong> environnement favorable, institutions et participation <\/strong>et<strong> institutions de gestion<\/strong> pour convenir ou de contester les notes du questionnaire pour chaque section et de faire des recommandations pour faciliter la mise en \u0153uvre de l\u2019ODD 6.5.1. Lors de la pl\u00e9ni\u00e8re de cl\u00f4ture, tous les participants ont apport\u00e9 des id\u00e9es pour le quatri\u00e8me volet du questionnaire<strong> \u201cFinances\u201d<\/strong>.<\/p>\n<p dir=\"ltr\"><span><img loading=\"lazy\" decoding=\"async\" alt=\"\" src=\"https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/whatsapp-image-2020-07-23-at-17.55.01-9-1.jpeg\" height=\"718\" width=\"1080\"><\/span><\/p>\n<p dir=\"ltr\"><span>En comparaison avec le score global de <\/span><strong>34%<\/strong><span> du rapport 2017, le score final obtenu apr\u00e8s consolidation du rapport sur la base des contributions de la consultation montre qu&#8217;il y a eu une augmentation de <\/span><strong>6%<\/strong><span> du score total pour atteindre <\/span><strong>40%<\/strong><span> en 2020. La section &#8220;<\/span><strong>Institutions et participation&#8221;<\/strong><span> ayant le score le plus \u00e9lev\u00e9 et <strong>&#8220;Finances&#8221;<\/strong> ayant le score le plus bas. Afin de mieux r\u00e9pondre \u00e0 certaines contraintes dans la mise en \u0153uvre de la GIRE et d&#8217;am\u00e9liorer les sections ayant obtenu de faibles scores, les parties prenantes ont fait des recommandations au gouvernement avec des particularit\u00e9s pour chaque section.<\/span><\/p>\n<p dir=\"ltr\"><span>L&#8217;atelier s&#8217;est termin\u00e9 par un mot du point focal de l\u2019ODD&nbsp; 6.5.1, <\/span><strong>Mme Ngo Biemble<\/strong><span>, qui a remerci\u00e9 les participants pour leurs contributions qui seront pleinement prises en compte lors de la consolidation du rapport avant sa soumission au <strong>PNUE<\/strong>.&nbsp; Les participants ont \u00e9galement exprim\u00e9 leur appr\u00e9ciation pour le processus de suivi de cette ann\u00e9e et se sont engag\u00e9s \u00e0 travailler \u00e0 la mise en \u0153uvre des recommandations de l&#8217;atelier \u00e0 tous les niveaux.&nbsp;<\/span><\/p>\n<p dir=\"ltr\"><img loading=\"lazy\" decoding=\"async\" alt=\"\" src=\"https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0010-scaled-1.jpg\" height=\"3648\" width=\"5472\"><\/p>\n<p><span><span><br><br><\/span><\/span><strong>PLAN D&#8217;ACTION<\/strong>&nbsp;<\/p>\n<ul>\n<li dir=\"ltr\">\n<p dir=\"ltr\" role=\"presentation\"><span>Diss\u00e9miner le rapport national de l\u2019ODD 6.5.1 aupr\u00e8s des acteurs du secteur de l&#8217;eau et plaider pour la mise en \u0153uvre des recommandations par tous les acteurs en fonction de leurs comp\u00e9tences.<\/span><\/p>\n<\/li>\n<li dir=\"ltr\">\n<p dir=\"ltr\" role=\"presentation\"><span>Plaider pour que le comit\u00e9 interminist\u00e9riel de suivi des ODDs prenne en compte les conclusions du rapport dans le rapport global sur la mise en \u0153uvre des ODDs au Cameroun.<\/span><\/p>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Organis\u00e9e par le Minist\u00e8re des Ressources en Eau et de l&#8217;Energie et le Partenariat National pour l&#8217;Eau du Cameroun (GWP-Cmr), la R\u00e9publique du Cameroun a tenu une consultation des parties prenantes le 23 juillet 2020 pour valider le rapport national sur l&#8217;indicateur 6.5.1 des Objectifs de D\u00e9veloppement Durable (ODDs) qui \u00e9value le degr\u00e9 de mise en \u0153uvre de la Gestion Int\u00e9gr\u00e9e des Ressources en Eau (GIRE).<\/p>\n","protected":false},"author":1,"featured_media":3935,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"iawp_total_views":2,"footnotes":""},"categories":[57,65,4],"tags":[],"class_list":["post-2873","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-archive","category-french","category-news"],"acf":[],"spectra_custom_meta":{"_sidebar_content":["field_69d4d421acab1"],"sidebar_content":[""],"_old_url":["field_69d4d472acab2"],"old_url":["https:\/\/www.gwp.org\/fr\/GWP-Afrique-Centrale\/GWP-CAf-EN-ACTION2\/activites\/la-republique-du-cameroun-evalue-le-degre-de-mise-en-uvre-de-la-gire\/"],"_last_date":["field_69d4d498acab3"],"last_date":["29\/10\/2020"],"_event_start":["field_69d4d4c4acab4"],"event_start":[""],"_event_end":["field_69d4d4dcacab5"],"event_end":[""],"_scrape_id":["field_69d4d4ebacab6"],"scrape_id":["04-GWP-French-Central-Africa"],"_wp_page_template":["default"],"_thumbnail_id":["3935"],"_pingme":["1"],"_encloseme":["1"],"_edit_last":["1"],"iawp_total_views":["2"],"_uag_page_assets":["a:9:{s:3:\"css\";s:0:\"\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:14:{i:0;s:13:\"core\/freeform\";i:1;s:11:\"core\/search\";i:2;s:10:\"core\/group\";i:3;s:12:\"core\/heading\";i:4;s:20:\"core\/latest-comments\";i:5;s:9:\"core\/list\";i:6;s:14:\"core\/list-item\";i:7;s:19:\"rank-math\/toc-block\";i:8;s:14:\"core\/accordion\";i:9;s:19:\"core\/accordion-item\";i:10;s:22:\"core\/accordion-heading\";i:11;s:20:\"core\/accordion-panel\";i:12;s:14:\"core\/paragraph\";i:13;s:10:\"core\/image\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1778857238\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"]},"uagb_featured_image_src":{"full":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1.jpg",1600,1067,false],"thumbnail":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1-150x150.jpg",150,150,true],"medium":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1-300x200.jpg",300,200,true],"medium_large":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1-768x512.jpg",768,512,true],"large":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1.jpg",1600,1067,false],"trp-custom-language-flag":["https:\/\/gwpo-gwp.org\/central-africa\/wp-content\/uploads\/sites\/19\/2026\/04\/minee_0003-scaled-1-18x12.jpg",18,12,true]},"uagb_author_info":{"display_name":"satsiriwinberg@gmail.com","author_link":"https:\/\/gwpo-gwp.org\/central-africa\/author\/satsiriwinberggmail-com\/"},"uagb_comment_info":0,"uagb_excerpt":"Organis\u00e9e par le Minist\u00e8re des Ressources en Eau et de l'Energie et le Partenariat National pour l'Eau du Cameroun (GWP-Cmr), la R\u00e9publique du Cameroun a tenu une consultation des parties prenantes le 23 juillet 2020 pour valider le rapport national sur l'indicateur 6.5.1 des Objectifs de D\u00e9veloppement Durable (ODDs) qui \u00e9value le degr\u00e9 de mise&hellip;","_links":{"self":[{"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/posts\/2873","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/comments?post=2873"}],"version-history":[{"count":2,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/posts\/2873\/revisions"}],"predecessor-version":[{"id":3699,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/posts\/2873\/revisions\/3699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/media\/3935"}],"wp:attachment":[{"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/media?parent=2873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/categories?post=2873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gwpo-gwp.org\/central-africa\/wp-json\/wp\/v2\/tags?post=2873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}